C'est parti pour les travaux - Work has at last started

The big machine arrives to start work


Day one and the first drainage trench is dug to channel spring water down the hillside away from the house (looking downhill)
The bottom end of the slope where the "aqueduct" carries the water away underneath the track in a large buried pipe
The end of the drainage pipe, bringing the spring water well away from the house
The smaller white drainpipe is for carrying rainwater from the roof of the house


new rainwater drain from the courtyard side of the house, leading into the pond for the frogs or for gardening!