![]() |
| The big machine arrives to start work |
![]() |
| Day one and the first drainage trench is dug to channel spring water down the hillside away from the house (looking downhill) |
![]() |
| The bottom end of the slope where the "aqueduct" carries the water away underneath the track in a large buried pipe |
![]() |
| The end of the drainage pipe, bringing the spring water well away from the house |
![]() |
| The smaller white drainpipe is for carrying rainwater from the roof of the house |
![]() |
| new rainwater drain from the courtyard side of the house, leading into the pond for the frogs or for gardening! |





